Timeline


  •         2/7/17    -   Signed purchase contract
  •         2/23/17  -   Vertical construction starts: 2nd building 
  •         2/28/17  -   Design studio appointment
  •         3/4/17    -   First townhouse building completed.
  •         3/7/17    -   Finalized design studio selections
  •         3/31/17  -   Starbucks opens
  •         4/9/17    -   Vertical construction starts: 3rd building
  •         4/12/17   -  Whole Foods opens
  •         4/14/17  -   Pre-Drywall walk through
  •         6/5/17    -   Our Closing (second building completed)
  •         7/5/17    -   Vertical construction starts: 4th building
  •         8/10/17  -   Third townhouse building completed.
  •         8/14/17  -   Comcast/Xfinity opens
  •         8/15/17  -   Vertical construction starts:  5th building