The planned opening date that I have been reporting here for over a year now (of the second quarter of 2021) is still on track. Actually now the developer is saying they are hoping to hit March 2021 as the opening date but lets stick with second quarter 2021 as this blogs prediction for now.
Today I had some folks asking what the new building was going to look like.
First, here are some renderings I had saved off from a presentation from before the Whole Foods was even built.
These should all still be pretty accurate, except for the fact that the building will be one story higher than these pictures.
I also recently found some new information I wanted to share.
Here is a new rendering of the building that was just provided by the builder:
Also here is some additional information they have recently provided:
The project consists of a wood frame over concrete podium that wraps around a 473-space above-grade precast parking garage. Riverdale Park Station consists of studio, one-, two-, and three-bedroom units with high-end features such as separate HVAC systems, modern kitchens, and balconies. Its ground-level amenities include a large courtyard with a trellis and fireplace, fitness center, media room, business center, and lounge.
Riverdale Park Station reduces its environmental footprint via EnergyStar® appliances and a bioretension area along one elevation of the building. The community also offers a large bicycle storage locker so residents can take advantage of several area bike paths, such as the historic trolley path that runs by the community.
So it seems the rumors that have been floating around about this apartment having a swimming pool are unfounded. Still it looks like it this apartment is going to a be a pretty high end, swanky place.
No comments:
Post a Comment